Complex modernization and development of the P.W. Agena building in Sopot, Aleja Niepodległości 942. Constrution work, plumbing, electrical works.
Constrution of the Wind Farm Krzyżanów - 10 wind turbines of total power 20 MW.
Adaptation of the office area for the Transcom company at the Real Shopping Centre in Gdańsk, 32 Kołobrzeska Street.
Construction of a transformer station 110/15kV, 120 MW and cable lines SN 30 kV (83.200 m) with a fiber optic network, electrical switchboards, distribution frame for 60 wind turbines. Execution of earthworks, access roads (180.00m2) assembly pads and foundations (22.800 m3 of concrete) for 49 wind turbines Gamesa G87-100 with 2 MW electric power each.
Constrution and assembly works for the Transformer Station Budzyń 110/15 KV, 25 MW.
Construction of shell of the building (foundation, reinforced concrete and masonry works) for about one third of the whole scope of work for this project.
Construction of a hotel (with Spa, swimming-pool, fitness and cardio center) complex in Ostrzyce-Somonino community. The total floorage of the complex is 2.754,3 m2.Execution of all works.


Construction of a new office building with a research and development laboratory as well as a workshop and storage facilities.Execution of all works as a General Contractor.
Constrution and power engineering works (foundation, access roads, assembly pads, cable network) for the Wind Farm Kraścino II project ( part Mołtowo). Five turbines of 1.5 MW power each.
Construction of foundations as well as all underground structures for the Crude Oil Distillation Unit II (CDU) in the area of the Grupa LOTOS S.A. in Gdańsk. At present CDU is the most up-to-date technology complex in the Polish oil industry.
The second stage of modernization of the electric power supply system in Świnoujście (NATO Task No. 14029)
Construction of the shell of The Shopping and Services Centre
The realization of 2NB 15002 and 2NB 15009 tasks
Turnkey construction of the Show - Sports Hall
The object will unite in himself functions sportingly - cultural with the audience on over 4000 seets
The consortium with Mostostal - Siedlce SA